Energy Audit at Electrical Safety Equipment Manufacturing Setup

Engineering June 1, 2022
Energy Auditor
Year 2022
Location Raychem RPG, Vasai & Naigaon plant
Client AAC Energy Consultants
Major Project Features Study of existing system and energy optimization in utilities & process. Solution worked out for replacing LPG-based heating with a heat pump.
Position Held Energy Auditor
Activities Performed Study of manufacturing process and use of various utilities. Study of energy-optimization measures in the plant.