| Year | 2022 |
|---|---|
| Location | Raychem RPG, Vasai & Naigaon plant |
| Client | AAC Energy Consultants |
| Major Project Features | Study of existing system and energy optimization in utilities & process. Solution worked out for replacing LPG-based heating with a heat pump. |
| Position Held | Energy Auditor |
| Activities Performed | Study of manufacturing process and use of various utilities. Study of energy-optimization measures in the plant. |