| Year | 2012-13 |
|---|---|
| Location | Pune |
| Client | Dinanath Mangeshkar Hospital (DMH) |
| Major Project Features | Study of energy-consumption pattern at DMH. Detailed study of the air-conditioning system; finding solutions for an efficient AC system. |
| Position Held | Student (M.Tech. Energy) |
| Activities Performed | Detailed study of energy-consumption and load pattern. Performance evaluation per BEE guidelines. Detailed AC-system study and sourcing of a more efficient solution. |