| Year | 2012-17 |
|---|---|
| Location | Cipla, Patalganga MIDC, Khopoli; Sun Pharmaceuticals, Paonta Sahib, Himachal Pradesh; Piramal Pharma, Navi Mumbai |
| Client | MITCON, AACEC |
| Major Project Features | Study of existing system and energy optimization in utilities. |
| Position Held | Energy Auditor |
| Activities Performed | Study of the process and use of various utilities. Study of energy-optimization measures in the plant. |